Climate and joinery
Hillside or seafront villas, direct exposure to wind and salt, sites with narrow access: in Saint-Barthélemy, joinery is planned together with logistics. Since Irma in 2017, large glass doors are sized for their exposure, and the design covers protection and possible lifting from the start.
The technical survey
The technical survey is combined with an access study — slopes, narrow passages, possible lifting — which shapes installation on the island.
Logistics
Sea shipping via Saint-Martin or direct depending on volume, aligned with your site schedule.
Lead times
The lead time from order to installation is given with your quote.
Architect, project manager or owner in Saint-Barthélemy: let's talk about your project from the drawing stage.